Start compaction at the highest temperature that will allow rolling.
Asphalt Calculator
MAXIMUM ROLLING SPEED (FPM) - Speed in feet/minute required to achieve desired IMPACTS/LINEAR FOOT (IPF)
| VPM | 10(IPF) | 11(IPF) | 12(IPF) | 13(IPF) | 14(IPF) |
|---|---|---|---|---|---|
| 1850 | 185 | 168.2 | 154.2 | 142.3 | 132.1 |
| 2000 | 200 | 181.8 | 166.7 | 153.8 | 142.9 |
| 2500 | 250 | 227.3 | 208.3 | 192.3 | 178.6 |
| 2700 | 240 | 245.5 | 225 | 207.7 | 192.9 |
| 3000 | 300 | 272.7 | 250 | 230.8 | 214.3 |
| 3100 | 210 | 281.8 | 258.3 | 238.5 | 221.4 |
| 3200 | 320 | 290.9 | 266.7 | 246.2 | 228.6 |
| 3400 | 340 | 309.1 | 283.3 | 261.5 | 242.9 |
| 3600 | 360 | 327.3 | 300 | 276.9 | 257.1 |
| 3800 | 380 | 345.5 | 316.7 | 292.3 | 271.4 |
| 4000 | 400 | 363.6 | 333.3 | 307.7 | 285.7 |
MAXIMUM ROLLING SPEED (MPH) - Speed in miles/hour required to achieve desired impacts/foot.
| VPM | 10(MPH) | 11(MPH) | 12(MPH) | 13(MPH) | 14(MPH) |
|---|---|---|---|---|---|
| 1850 | 2.1 | 1.9 | 1.8 | 1.6 | 1.5 |
| 2000 | 2.3 | 2.1 | 1.9 | 1.7 | 1.6 |
| 2500 | 2.8 | 2.6 | 2.4 | 2.2 | 2.0 |
| 2700 | 3.1 | 2.8 | 2.6 | 2.4 | 2.2 |
| 3000 | 3.4 | 3.1 | 2.8 | 2.6 | 2.4 |
| 3100 | 3.5 | 3.2 | 2.9 | 2.7 | 2.5 |
| 3200 | 3.6 | 3.3 | 3.0 | 2.8 | 2.6 |
| 3400 | 3.9 | 3.5 | 3.2 | 3.0 | 2.8 |
| 3600 | 4.1 | 3.7 | 3.4 | 3.1 | 2.9 |
| 3800 | 4.3 | 3.9 | 3.6 | 3.3 | 3.1 |
| 4000 | 4.5 | 4.1 | 3.8 | 3.5 | 3.2 |
PASSES REQUIRED FOR ONE COVERAGE - The paving width divided by the roller width (includes a 6″ overlap)
| Pave Width | Roller Width(54″) | Roller Width(66″) | Roller Width(78″) | Roller Width(84″) |
|---|---|---|---|---|
| 10' | 3 | 2 | 2 | 2 |
| 11' | 3 | 3 | 2 | 2 |
| 12' | 3 | 3 | 2 | 2 |
| 13' | 4 | 3 | 3 | 2 |
| 14' | 4 | 3 | 3 | 2 |
| 15' | 4 | 3 | 3 | 3 |
| 16' | 4 | 4 | 3 | 3 |
| 17' | 5 | 4 | 3 | 3 |
| 18' | 5 | 4 | 3 | 3 |
| 19' | 5 | 4 | 4 | 3 |
| 20' | 5 | 4 | 4 | 4 |
| 21' | 6 | 5 | 4 | 4 |
| 22' | 6 | 5 | 4 | 4 |
| 23' | 6 | 5 | 4 | 4 |
| 24' | 6 | 5 | 4 | 4 |