Skip to main content
Products
Projects
Careers
Community
RockBlog
Environmental Responsibility
Skip to main content
Toggle navigation
PRODUCTS
Aggregates
Granite
Recycle
River Rock
Sand
Asphalt & Emulsions
Building Materials
Concrete
Patching Materials
Project Checklist
Safety Data Sheets (SDS)
Sustainability
Tech Notes
SERVICES
Pavement Preservation
General Construction Services
Research Technical Services
Logistics
PROJECTS
Paving
Cold-In-Place Recycling
Concrete
Grading
Airports
Underground
Excavation
Emergency Work
CAREERS
Professional
Skilled Craft
Intern Program
COMMUNITY
ENVIRONMENTAL RESPONSIBILITY
ABOUT US
HMA Paving Checklist
Customer
Job Name
Date
Sales Representative
Plant
GX#
Load Time
Jobsite Load out
Mix Temp
GX#
Load Time
Jobsite Load out
Mix Temp
GX#
Load Time
Jobsite Load out
Mix Temp
Project Conditions
a. Ambient Temperature
b. Surface temperature/conditions
c. Weather condtions
HMA
a. Product code/aggregate size
b. Mix temperature (Truck, paver, mat)
c. Mix appearance (dry, coarse, wet etc.)
Scope of work
a. Street overlay, parking lot, patch paving etc.
HMA Placement
a. Lift thickness (Base or Top lift)
*
b. Tack coat
Yes
No
*
c. Raking
Yes
No
Rollers (Tire type, roller size, vibrator, rolling speed)
i. Break down
ii. Intermediate
iii. Finish
Comments