Oakland Airport Project
Project Description
Removing and replacing/improving all existing Passenger Boarding Bridges, pavements, storm drainage, waterline, jet fuel lines, lighting, and striping surrounding Terminal One.
Major items of work included asphalt and concrete demolition, excavation, storm drain and waterline, jet fuel line improvements, grading, paving, and passenger boarding bridge improvements.








Keith Severson was the keynote speaker at the 2013 Ohio Asphalt Expo.
Sandra Smith-Dugan’s exhibit is at the Cupertino Design Center. Join us for an artist reception 4.26.2013.