Half Moon Bay Airport Project
Runway Resurfacing Project
Owner: County of San Mateo
Scope of Work
The work completed consisted of Runway Resurfacing at the Half Moon Bay Airport, including pavement repair, paving fabric installation, asphalt overlay, pavement marking and shoulder backing. Work added by the owner to the project included installing FAA electrical conduit with wiring, additional cold planing, asphalt overlay and pavement marking on Taxiways A and C.
Project Highlights
- PCC Cold Milling 45,000 Square Feet
- AC Cold Milling 15,000 Square Feet
- Paving Fabric 6,000 Square Yards
- Type A Asphalt Concrete 13,500 Tons
- Shoulder Backing 114,000 Square Feet (installed grindings from cold planing the existing AC & PCC as shoulder base)
- All New Pavement Markings per FAA specifications








Graniterock wins 2012 UCON R.E.A.L. Safety Award May 2013
5K Run, 5K Walk and Quarry Open House