Palm Drive ReconstructionMission StreetSan Francisco International85/101 InterchangeColeman AvenueWestern Farm ServiceSFO TerminalHalf Moon Bay AirportSalinas Municipal Airport Runway 8-26 and Taxiway AHighway 1/17 Merge LanesFowler Creek ParkDe Mattei Sea WallScotts Valley DriveMerchant RoadHighway 25 BypassSynthetic TurfCapitola Road and Soquel AvenueFoothill College Pedestrian BridgePort of OaklandSanta Cruz Median ImprovementsSeaside Auto Mall

Half Moon Bay Airport Project

Runway Resurfacing Project
Owner: County of San Mateo

Scope of Work
The work completed consisted of Runway Resurfacing at the Half Moon Bay Airport, including pavement repair, paving fabric installation, asphalt overlay, pavement marking and shoulder backing. Work added by the owner to the project included installing FAA electrical conduit with wiring, additional cold planing, asphalt overlay and pavement marking on Taxiways A and C.

Project Highlights

  • PCC Cold Milling 45,000 Square Feet
  • AC Cold Milling 15,000 Square Feet
  • Paving Fabric 6,000 Square Yards
  • Type A Asphalt Concrete 13,500 Tons
  • Shoulder Backing 114,000 Square Feet (installed grindings from cold planing the existing AC & PCC as shoulder base)
  • All New Pavement Markings per FAA specifications

Half Moon Bay Airport Project

Half Moon Bay Airport Project

Half Moon Bay Airport Project

Half Moon Bay Airport Project

Half Moon Bay Airport Project

Half Moon Bay Airport Project

Half Moon Bay Airport Project

    © 2001–2008 Graniterock. All Rights Reserved.
    Products & Services    News & Events    Careers    Projects    Contact Us    Locations    About Us