Palm Drive ReconstructionMission StreetSan Francisco International85/101 InterchangeColeman AvenueWestern Farm ServiceSFO TerminalHalf Moon Bay AirportSalinas Municipal Airport Runway 8-26 and Taxiway AHighway 1/17 Merge LanesFowler Creek ParkDe Mattei Sea WallScotts Valley DriveMerchant RoadHighway 25 BypassSynthetic TurfCapitola Road and Soquel AvenueFoothill College Pedestrian BridgePort of OaklandSanta Cruz Median ImprovementsSeaside Auto Mall

Foothill College Pedestrian Bridge Project

Installation of a prefabricated 92′ long, 10′ wide bridge placed over a live creek on to 2 abutments with a 265 ton crane. The process took approximately 6 hours including traffic control set up and required assembly of the bridge prior to setting. The most challenging part was ensuring that the 4 anchor bolts that were embedded into the abutments had been placed correctly in order for the bridge to be set exactly as assembled.

Foothill College Pedestrian Bridge Project

Foothill College Pedestrian Bridge Project

Foothill College Pedestrian Bridge Project

Foothill College Pedestrian Bridge Project

Foothill College Pedestrian Bridge Project

    © 2001–2008 Graniterock. All Rights Reserved.
    Products & Services    News & Events    Careers    Projects    Contact Us    Locations    About Us